Equipment Installation - Micromeritics GEMINI VII 2390 Installation Instructions And Checklist

Surface area analyzer
Hide thumbs Also See for GEMINI VII 2390:
Table of Contents

Advertisement

2 E
QUIPMENT
The installation location must be in an area that is easily accessible from all sides for servicing
n
and operating.
The instrument cannot be installed in a wet area.
n
The power cable should be connected only to a suitable wall outlet.
n
Gas cylinders should be placed within 6 ft (2 m) of the degasser. The same gas cylinder can be
n
used for both the prep station and the instrument by using a tee fitting on the gas supply line.
Only inert gasses (helium, nitrogen, or argon) should be used for sample preparation. Inert
n
gasses in the quantities used by the degasser do not pose a health hazard to users.
The equipment must be positioned such that the mains supply is not obstructed and is easily
n
accessible to disconnect the equipment from the AC main power supply.
Gemini VII 2390 Installation Instructions and Checklist
239-42870-02 Rev (B) — May 2021
I
NSTALLATION

2 Equipment Installation

2 - 1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GEMINI VII 2390 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

Gemini vii 2390aGemini vii 2390pGemini vii 2390t

Table of Contents