Overhaul Or Replacement Schedule - Beechcraft Musketeer Sport III A23-19 Pilot Operating Handbook

Table of Contents

Advertisement

BEECHCRAFT Sport III
Musketeer A23-19. 19A
Section VIII
Handling. Serv
-
Maint
OVERHAUL OR REPLACEMENT SCHEDULE
The first overhaul or replacement should be performed not
later
than the required period
.
The condition of the
item
at
the end of the first period can be used as a criterion for
determining
subsequent
periods
applicable
to
the
individual
airplane or fleet
operation,
providing the
operator has an approved monitoring system.
The time periodsfor inspection noted in this handbook a re
based on average usage and average environmental
conditions
.
SPECIAL CONDITIONS CAUTIONARY NOTICE
Airplanes operated for Air Taxi or other than normai
operation and airplanes operated in humid tropics or cold
and damp climates, etc
.,
may need more frequent
inspections
for wear, corrosion
andj
or lack of lubrication
.
In these areas periodic inspections should be performed
until the operator can set his own
inspection
periods based
on experience
.
NOTE
The
required periods do not constitute a
guarantee that the item will reach
the
period
without malfunction, as the aforementioned
factors
cannot
be
controlled
by
the
manufacturer.
October 1979
8 -39

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Musketeer sport iii a23-19a

Table of Contents