Balked Landing; After Landing; S Hutdown; Environmental Systems - Beechcraft Musketeer Sport III A23-19 Pilot Operating Handbook

Table of Contents

Advertisement

SectioniV
Normai Procedures
BALKED LANDING
1.
Carburetor Heat
-
COLO
2.
Power
-
FULL THROTTLE
BEECHCRAFT Sport III
Musketeer
A23- 19,
19A
3.
Airspeed - 58
kts/
67 mph until elear of obstacles, then
trim to BEST RATE-OF-CLIMB
4. Flaps
-
UP
AFTER LANDING
1.
Land ing Light - AS REQUIRED
2.
Flaps
-
UP
3. Trim Tab
-
SET TO
S HUTDOWN
1.
Brakes
-
SET
2.
Fuel Boost Pump
-
OFF
3.
Electrical and Avionics Equipment
-
OFF
4.
Throttle - CLOSE
5.
Mixture - ID LE CUT -OFF
6
. Magneto/
Start Switch
-
OFF
.
after engine stops
7.
BATTERY & ALT Switch
-
OFF
8.
AL T Switch - OFF
9.
Control Lock
-
INSTALL, if conditions warrant.
10.
lnstall wheel chocks and release brakes if the airplane
is to be leh
unattended.
ENVIRONMENTAL SYSTEMS
HEATING AND VENTILATION
Refer to the SYSTEMS DESCRIPTION Section for
op-
eration ot heating and ventilation controls
.
4-12
October 1979

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Musketeer sport iii a23-19a

Table of Contents