6.2 Power on
1.
Insert the power cable.
UPS Switch
(power dip/loss recovery)
Ethernet port
2.
Flip ON the UPS (optional) to activate power dip/loss recovery function. Battery will start to charge if not fully charged
already. For this to function properly, the battery needs to be charged.
NOTE: When this switch is on, the battery will charge itself until full even when the power switch is turned off.
3.
Flip ON the power switch.
The lights of the print-head turn on immediately
-
The screen boots up in about 40 seconds.
-
Quick Start Guide FELIX Pro L / XL
Power switch
Page 8