Setup And Connection; Requirements For The Installation Location - Soyer BMS-9 Operating Instructions Manual

Stud welding device, guns
Table of Contents

Advertisement

10 Setup and connection

10.1 Requirements for the installation location

The installation location for the stud welding device must be clean and dry. Observe the
permissible temperatures in chapter "6.4 Technical data for BMS-9(V) stud welding
device" on page 20. Ensure that ventilation for the stud welding device is sufficient. Do
not install the stud welding device in an unventilated room. There is a danger of
overheating.
Ensure that the installation surface is flat, clean and stable.
The installation location and workplace must comply with legal requirements.
Ensure that the installation location has a good accessibility for maintenance work.
Make sure that the stud welding device cannot be soiled by dust (especially metal dust
or chips) caused by work in the immediate surroundings (e.g. grinding work).
Danger from humid operation site or mobile use
There is a danger of electrocution when operating the stud welding device in a
humid environment.
Danger from welding vapours
Vapours that are dangerous to health may occur, depending on the material of the
workpiece and/or the welding stud.
The stud welding device must only be operated stationary and in closed and
dry rooms. Mobile use is not permissible.
Ensure suitable suction of welding vapours, if necessary.
Operating instructions Soyer Bolzenschweißtechnik
35

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bms-9vPs-9Ps-9kPs-1k

Table of Contents