Dell EMC PowerEdge R6525 Installation And Service Manual page 74

Hide thumbs Also See for PowerEdge R6525:
Table of Contents

Advertisement

Figure 72. Closing the rail frame
3. Secure the force plate to the processor socket base by tightening the screws in the sequence 1, 2, and 3. When all three
screws are fully threaded, the socket is then actuated. The three screws are tightened to a torque value of 12.0 ± 1.2 lbf-in.
NOTE:
The screw numbers are marked on the force plate.
NOTE:
Press the force plate while tightening the screws to avoid tilting of the processor cover out of the processor
socket.
Figure 73. Securing the force plate
74
Installing and removing system components

Advertisement

Table of Contents
loading

This manual is also suitable for:

E67s

Table of Contents