Downloading The Test Data - Huawei UPS5000-H Series User Manual

100 kva power module
Hide thumbs Also See for UPS5000-H Series:
Table of Contents

Advertisement

UPS5000-H-(400 kVA-600 kVA)
User Manual (100 kVA Power Module)
Context
Before performing a capacity test, ensure that:
● The UPS is working in normal mode; float charging or hibernation has lasted
● The UPS generates no battery overtemperature, overvoltage, or overcurrent
● The mains, batteries, charger, and discharger are normal. No overload alarm is
● The SmartLi generates no alarms related to lithium batteries.
Procedure
Step 1 On the home screen of the LCD, choose System Info > Maintenance > Battery
Maint.
Step 2 Tap Start on the right of Capacity Test to start a capacity test.
Figure 7-13 Starting a capacity test
----End

7.6.3 Downloading the Test Data

Issue 01 (2020-11-30)
NO TICE
for 2 hours after the SOC reaches 100%; the load rate fluctuation is less than
10%.
alarm. No generator is connected to the UPS.
generated.
NO TE
The capacity test automatically stops in any of the following cases:
● The minimum electrochemical cell voltage reaches 2.65 V.
● The load fluctuation exceeds 10%.
● An alarm is generated.
The test is complete when the minimum cell voltage reaches 2.65 V. The test data is
obtained from the capacity test. Save the test data obtained from the latest 36 tests.
Copyright © Huawei Technologies Co., Ltd.
7 System Commissioning
82

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ups5000-h-400 kvaUps5000-h-500 kvaUps5000-h-600 kva

Table of Contents