UPS5000-H-(400 kVA-600 kVA)
User Manual (100 kVA Power Module)

7.1 Powering On and Starting the UPS

Prerequisites
Measure the voltage and frequency values of the UPS upstream input switches.
The line voltage range is 138–485 V AC, and the frequency range is 40–70 Hz.
Table 7-1 UPS system user list
Default User
admin
(administrator)
operator
(common user)
Context
Issue 01 (2020-11-30)
7
Preset Password
LCD
Web
LCD
Web
The following operations are applicable to a single UPS. For parallel systems,
contact Huawei technical support.
Before power-on, ensure that the devices have passed all check items in
section "Verifying the Installation."
Before power-on, ensure that all the UPS switches and upstream switches are
OFF.
Copyright © Huawei Technologies Co., Ltd.

System Commissioning

7 System Commissioning
000001
Changeme
000001
Changeme
67