Carrier WeatherExpert 48N2 Controls, Start-Up, Operation, Service, And Troubleshooting page 259

Packaged rooftop cooling units with gas heat, optional electric heat, or hydronic heat and comfortlink controls version 10.x
Table of Contents

Advertisement

I. Project Information
Job Name __________________________________________________________________________________________________
Address ____________________________________________________________________________________________________
City ___________________________________________________________ State ____________________ Zip ______________
Installing Contractor Name ___________________________________________________ Phone ___________________________
Equipment tag / Mark for ______________________________________________________________________________________
Sales Office _________________________________________________________________________________________________
Prestart-up Performed by (Name) _______________________________________________ Phone __________________________
Unit Model (18 Chars) ____________________________________________ Serial (10 Chars) ____________________________
Design Information
Supply Airflow
External Static
(CFM)
Pressure (ESP)
II. Start-Up
Electrical (All readings to be taken at full load
Supply Voltage
Check Voltage Imbalance
Average Voltage = (L1-L2 + L2-L3 + L3-Ll)/3
Maximum Deviation from Average Voltage = _______________
Voltage Imbalance = _______________% (max. deviation/average voltage) x 100
Voltage imbalance less than 2%.
(Do not start unit if voltage imbalance is greater than 2%. Contact local utility for assistance.)
Compressor Motor Current (amps):
Compressor A1
Compressor A2
Compressor A3
Compressor A4
Compressor B1
Compressor B2
Compressor B3
Compressor B4
Supply Fan Amps (measured)
Exhaust Fan Amps
Fan amp readings must be taken with a true RMS meter for accuracy
Fan amp reading must be taken with the fan running at 60 Hz.
Condenser Fan Motor Current (amps):
Outdoor Fan Motor 1
OFM 2
OFM 3
OFM 4
OFM 5
OFM 6
Start-Up Checklist for 48/50N-Series Packaged Rooftop
(Remove and use for Job File)
Return Air Temperature (RAT)
Dry Bulb (DB)
L1-L2 ______________
L1___________
L1___________
L1___________
L1___________
L1___________
L1___________
L1___________
L1___________
L1___________
L2 ___________
L1___________
L2 ___________
L1___________
L1___________
L1___________
L1___________
L1___________
L1___________
Wet Bulb (WB)
L2-L3 _______________
L2 ___________
L2 ___________
L2 ___________
L2 ___________
L2 ___________
L2 ___________
L2 ___________
L2 ___________
L3 ___________
L3 ___________
L2 ___________
L2 ___________
L2 ___________
L2 ___________
L2 ___________
L2 ___________
CL-3
Condenser
Supply Air
Entering Air
Temperature
Temperature
L3-L1 ___________
Yes
No
L3 ___________
L3 ___________
L3 ___________
L3 ___________
L3 ___________
L3 ___________
L3 ___________
L3 ___________
ComfortLink ___________
ComfortLink ___________
L3 ___________
L3 ___________
L3 ___________
L3 ___________
L3 ___________
L3 ___________

Advertisement

Table of Contents
loading

Table of Contents