Installation Work Manual
Connection to the outdoor unit
There is a closing valve inside the outdoor unit.
Use to evacuate the local
refrigerant piping and additional
charging with refrigerant. Open and
close with a double-spanner. Be
sure to fit the cap again after
completing the operation.
Securely fit the packing (packed
together) into the flange of the valve
to prevent gas leaks. Apply
refrigerating machine oil to both end
faces of the packing.
Use to evacuate the local
refrigerant piping and additional
charging with refrigerant. Open and
close with a double-spanner. Be
sure to fit the cap again after
completing the operation.
Securely fit the packing (packed
together) into the flange of the valve
to prevent gas leaks. Apply
refrigerating machine oil to both end
faces of the packing.
45
[Discharge gas side]
Cap, copper packing
Remove the cap to operate
the valve stem. Be sure to fit
again after completing the
operation.
Service port
Flange
(packed together)
Local pipe
M6 hexagon socket head cap screw
[Discharge gas side]
Cap, copper packing
Remove the cap to operate
the valve stem. Be sure to fit
again after completing the
operation.
Service port
Flange
(packed together)
Local pipe
M6 hexagon socket head cap screw
7 Installing the Outdoor Unit
GYEQ20AN
[Suction gas side]
[Fluid side]
Local pipe
Unit: N•m
Flare nut tightening torque
11±1
GYEQ30AN
[Suction gas side]
[Fluid side]
Local pipe
Unit: N•m
Flare nut tightening torque
11±1
– 17 –
SiAUY361411EA
Valve stem
The handle is fully closed when
shipped from the factory, during pipe
connection work, vacuuming and
charging with additional refrigerant.
Stopper pin
The valve stem turns up to 90 degree.
Service port
Use to evacuate the local refrigerant
pipe and additional charging with
refrigerant. Open and close with a
double-spanner. Be sure to fit the cap
again after completing the operation.
(Cap tightening torque: 11.8 - 14.7N•m)
Flange
(packed together)
Packing
(packed together)
026746-03EN00
Valve stem
The handle is fully closed when
shipped from the factory, during pipe
connection work, vacuuming and
charging with additional refrigerant.
Stopper pin
The valve stem turns up to 90 degree.
Service port
Use to evacuate the local refrigerant
pipe and additional charging with
refrigerant. Open and close with a
double-spanner. Be sure to fit the cap
again after completing the operation.
(Cap tightening torque: 11.8 - 14.7N•m)
Flange
(packed together)
Packing
(packed together)
026747-02EN00
0FGHP-EN0801 DGJ002
Device Overview

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gyeq30an

Table of Contents