Checklist for the Completion of Work
Confirm the following contents after the completion of work and adjust if required.
Check
The electrical wiring uses a dedicated branch circuit that is not shared with other electric equipment.
(The electrical wiring is an dedicated branch circuit.)
An earth leakage circuit breaker, isolating switch (with fuse), or wiring circuit breaker with the appropriate
capacity is used.
Use specified cables (wire type/thickness) for electrical work. The cables should be perfectly connected to the
appropriate connectors and fastened tightly so that the connecting terminals will not be exposed to external
forces via the cables.
The thickness of wiring is equal to, or greater than, the prescribed size.
The power supply and voltage are the same as the specification shown on the units (identification plates).
The earth wire is not connected to the earth wire of a telephone, gas pipe, water pipe or conductor rod.
The earthing work has been done.
Device Overview
3. Setting and Rewiring the Outdoor Unit
Item to confirm
– 9 –
Wiring Manual
0FGHP-EN0821 DGJ002