Unpacking And Inspecting; Checking The Accessories; Installing The Host Adapter - ADIC FastStor FastStor Mass Storage Device Installation And Operating Manual

Adic faststor mass storage device installation and operating guide
Table of Contents

Advertisement

For the most part, installation is simply a matter of checking all necessary SCSI connections, installing the application software
(backup or otherwise) on the host computer, and applying power. The FastStor defaults set at the factory should be sufficient for
most applications.

Unpacking and Inspecting

If the operating environment differs from the storage environment by 15° C
(30° F) or more, let the unit acclimate to the surrounding environment for at
least 12 hours.
Unpack all items from the carton. Save the packing materials in case you need to move or ship the system in the future.
You must ship the FastStor in the original or equivalent packing materials or
your warranty may be invalidated.

Checking the Accessories

Check to make certain that the following items are included with your FastStor:
Power cord
One cleaning cartridge, or a coupon for a free DLT cleaning cartridge
One SCSI cable with 68-pin HD/ 68-pin HD connectors
One active 68-pin SCSI bus terminator
A Media Carrying Tote with plastic lid
This manual
A Quick Reference Guide
A Warranty Registration card
Two keys for the front door
None of the items should show signs of damage.

Installing the Host Adapter

At this point if your host computer system does not have native SCSI capability and the host adapter you are using is not installed,
please install it. Refer to the manual that came with your host adapter for specific directions.
When the host adapter card is installed return to this point in the manual.
12
Hardware Installation
Caution
Caution

Advertisement

Table of Contents
loading

Table of Contents

Save PDF