Preparing Cables For Sealing Modules - ABB ACS6080 User Manual

System drives
Hide thumbs Also See for ACS6080:
Table of Contents

Advertisement

6.8.2

Preparing cables for sealing modules

For information on installing the sealing modules and using the
compression wedge, see the Roxtec CF16EMC installation instructions in
"Appendix A – Additional manuals".
(1) Sealing modules
1. Unscrew the frame.
2. Prepare the cables with an outer cable screen for EMC bonding with
the metal enclosure of the cabinet as illustrated in Fig. 6-26.
(1) Sealing module
(2) Conductive foil
(3) Cable sheath removed to
expose cable shield
3BHS842007 E01 REV C
1
Figure 6-25 Cable entry with sealing modules
Figure 6-26 Preparing control cables for sealing modules
(2) Compression wedge
1
2
3
(4) Conductor screen extension to
connect to PE terminal
ACS6080 USER MANUAL
06 ELECTRICAL INSTALLATION
2
4
4
4
144/238

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents

Save PDF