Preparing Cables For Sealing Modules - ABB ACS6080 User Manual

System drives
Hide thumbs Also See for ACS6080:
Table of Contents

Advertisement

6.7.2

Preparing cables for sealing modules

1. Prepare cables with an outer cable screen or shield for EMC bonding
with the metal enclosure of the cabinet as illustrated in Fig. 6-18.
1
2
3
4
5
6
(1) Sealing module
(2) Frame
(3) Conductive foil of
sealing module
(4) Cable clamp
(5) Shrinkable sheath seal
(6) Heat shrinkable termination
(7) Outer cable sheath
2. Install the sealing modules according to the instructions of the
sealing module supplier.
3BHS842007 E01 REV C
Figure 6-18 Preparing power cables for sealing modules
ACS6080 USER MANUAL
7
8
12
9
10
11
(8) Cable sheath removed to expose
cable shield
(9) Shield extension to connect to
PG busbar
(10) Cable screen extension to
connect to the PG busbar
(11) Cable lug as specified by the
cable supplier and suitable for
M12 bolt
(12) Sheath seal
06 ELECTRICAL INSTALLATION
137/238

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents