Installation - ABB ACS6080 User Manual

System drives
Hide thumbs Also See for ACS6080:
Table of Contents

Advertisement

5.8.1.1

Installation

NOTICE
Risk of damage!
Incorrect installation of the heat exchanger cables can cause:
• Ground fault
• Unexpected shutdown of the drive
• Damage to the heat exchanger
Procedure:
1. Before lifting the heat exchanger onto the roof, cut off the cable ties.
2. Loop the cables as illustrated and fasten them to the cable tie
mounts (circles).
3BHS842007 E01 REV C
2 x
ACS6080 USER MANUAL
05 MECHANICAL INSTALLATION
107/238

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents