ABB ACS6080 User Manual page 17

System drives
Hide thumbs Also See for ACS6080:
Table of Contents

Advertisement

Figure 5-8
AC busbar joints between the COU/TEU and LSU
(14 MVA).
Figure 5-9
Air-to-air heat exchanger (type LT-5-5165-UL)
Figure 5-10
Tools for installing an air-to-air heat exchanger
Figure 5-11
Correct and incorrect cable installation
Figure 5-12
ARU/INU/IFU cable routing
Figure 5-13
LSU cable routing
Figure 5-14
Air-to-air heat exchangers (type LT-5-5165-UL)
Figure 5-15
Tools for removing an air-to-air heat exchanger
Figure 5-16
Installation example of transformers in an air-to-air
heat exchanger
Figure 5-17
Connect wires to terminal block
Figure 5-18
Pressure relief vents
Figure 5-19
Tools required to fasten the pressure relief vent
to the roof
Figure 5-20
Installation example of pressure relief vents
Figure 5-21
Attach sealing tape to the joining crossbar (1)
Figure 5-22
Roof joints (1)
Figure 5-23
Roof attachment parts
Figure 5-24
Recommended ceiling and wall fixings
Figure 6-1
Phase module on lift table
Figure 6-2
Grounding the input side (A) and output side (B)
of the drive system
Figure 6-3
System ground connection (1) in a 600 mm TEU
Figure 6-4
Grounding the EXU
Figure 6-5
Cable tray and cable ducts in an LSU (A =
front)
Figure 6-6
Arc Guard System™ in an optional roof extension
box (REB)
Figure 6-7
Location of Arc Guard sensors in a TEU
102
106
106
108
110
110
111
112
114
115
115
116
116
117
118
119
120
121
123
124
125
126
127
128

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents

Save PDF