Figure 8-8
Arc Guard System™ in a WCU REB
Figure 8-9
HMI panel
Figure 9-1
Labels on S500 I/O modules and associated wiring
diagram
Figure 9-2
Cable and wire designation
Figure 9-3
Assistant control panel
Figure 9-4
BCU-55 control unit front view (A) and rear view
(B)
Figure 9-5
S500 I/O modules in a COU
Figure 9-6
Status LEDs on optional air-to-air heat exchangers
Figure 9-7
Grounding switch ungrounded
Figure 9-8
Grounding switch grounded
Figure 9-9
Grounding switch grounded
Figure 9-10
Testing the white lamp
Figure 9-11
Safety switch on an ARU/INU cabinet door
Figure 9-12
Safety switch settings
Figure 9-13
Four-way grounding set
Figure 9-14
TEU ground ball stud locations
Figure 9-15
ARU/INU ground ball stud locations
Figure 9-16
Manual output isolation overview
Figure 9-17
Tools for removing the busbar connectors
Figure 9-18
Overview of grounding the drive - INU1 is shut
down (A) and INU2 is
shut down (B). Numbers indicate the connection
sequence.
Figure 9-19
Connect the grounding sets in COU1 (A and C),
TEU1 (B), INU1 (D) and INU2 (E)
Figure 9-20
Busbar connector removal sequence in TEU1 or
COU1
Figure 9-21
Fitting sequence for busbar connectors
183
183
186
186
190
190
191
192
195
196
198
200
202
203
204
205
206
207
208
209
210
211
212