Figure 6-8
Cable tray and cable ducts in an LSU (A =
front)
Figure 6-9
Cable entry with type 1 sealing modules
Figure 6-10
Cable entry frame with type 1 sealing modules
Figure 6-11
Cable entry with type 2 sealing modules
Figure 6-12
Cable gland
Figure 6-13
Cable entry with EMC plates
Figure 6-14
TEU 1000 mm cabinet (A = back) with top (1)
and bottom (2) cable entries
Figure 6-15
Short busbar removal in ARU
Figure 6-16
EXU with top cable entry (A) and EXU with
bottom cable entry (B)
Figure 6-17
EXU cabinet
Figure 6-18
Preparing power cables for sealing modules
Figure 6-19
Prepare power cables for cable glands
Figure 6-20
Preparing cables for EMC plates: (A) cables with
an outer screen or shield, (B) cables without an
outer screen or shield or (C) cables in an
EXU cabinet
Figure 6-21
Cable connections in an EXU cabinet
Figure 6-22
Minimum distance between bolted joints of different
phases in an EXU
Figure 6-23
Bolted busbar connection - marine drives
Figure 6-24
Bolted busbar connection - non-marine drive
Figure 6-25
Cable entry with sealing modules
Figure 6-26
Preparing control cables for sealing modules
Figure 6-27
Preparing auxiliary control cables for cable glands
Figure 6-28
Preparing the screens of control cables for EMC
plates
Figure 6-29
Preparing control cables for EMC plates
128
129
130
131
131
132
133
134
135
135
137
138
139
140
141
141
142
144
144
145
146
147