05 MECHANICAL INSTALLATION
6. Route the cables through the designated openings (circle) at the
front of the cabinet.
7. While lowering the heat exchanger onto the roof, pull the cables
through the openings.
3BHS842007 E01 REV C
ACS6080 USER MANUAL
109/238