4.8.3

Phase sequence testing

In order to carry out phase sequence testing, the cable is to
be connected inductively to suitable measuring equipment
(e.g. MUCO phase sequence testing unit).
R
EMARK
The earthing caps with extended connection pins
are used.
Procedure:
1.
Isolate the installation.
2.
Provide earthing using the earthing caps with
extended connection pins and the earthing spider.
R
EMARK
Do not remove the short-circuit strip nor the
earthing spider.
3.
For each phase, place the induction coil of the testing
unit around the extended connection pin, between the
earthing cap and the short-circuit strip.
4.
Perform the measurement.
5.
Remove all measurement connections.
(MUCO) phase sequence testing unit
2.
Magnefix MD4