Otto Bock DynamicArm 12K100N Instructions For Use Manual page 17

Hide thumbs Also See for DynamicArm 12K100N:
Table of Contents

Advertisement

6.8 The pull cable
Complete the following additional steps to finish the switch cable:
DynamicArm 12K100N
6) Lift and remove the red assembly clamp.
7) The lifter strap must not be removed from the elbow
ball. Fixing the lifter strap in place (e.g. with a hae­
mostat) is no longer necessary.
8) Slide the strap clamp under the lamination ring.
9) Install the Allen head screw.
1) Bring the forearm into neutral position (no outward
or inward rotation).
2) Affix the cable guide to the socket with cap screws
(centred in relation to the strap clamp and approx.
30 mm away from the lamination ring).
CAUTION! The pull cable is to be used for
emergency operation only. For safety reasons,
it must not be removed!
3) Rotate the socket in and out up to the stop. Ensure
that the pull cable does not tighten.
Preparation for use
17

Advertisement

Table of Contents
loading

Table of Contents