Configuring The Valve Terminal/Valve Sensor Terminal - Festo VIFB-02 Series Manual

Valve terminal/valve sensor terminal with field bus connection
Hide thumbs Also See for VIFB-02 Series:
Table of Contents

Advertisement

VIFB8 – 02

Configuring the valve terminal/valve sensor terminal

Red LED
Board 1
Screening
Board 2
Fig. 4/13: Connections, operation and display elements of RIO node
4-24
4. Installation
There are two PC boards in the RIO node.
Board 1 contains the red LED; board 2 contains
a green LED and a switch for setting the address
and baud rate.
1
2
DIL-switch
(baud rate)
Green LED
Address
selector switch
RIO
connection
9706

Advertisement

Table of Contents
loading

Table of Contents