Connect The Harness Cable To The Sensors; Connect The Harness Cable To The Controller Cable; Connect The Field Computer; Connect The Power Leads - Raven AutoBoom Installation Manual

Metalfor 2200, 2500, and 3000 series
Hide thumbs Also See for AutoBoom:
Table of Contents

Advertisement

Connect the Harness Cable to the Sensors

Locate the Center Sensor connector on the AutoBoom harness cable.
1.
Connect the Center Sensor connector to the installed center sensor (P/N 063-0130-018).
2.
Locate the Left Outer Sensor connector on the AutoBoom harness cable.
3.
Connect the Left Outer Sensor connector to the installed left sensor cable (P/N 115-0230-050).
4.
Locate the Right Outer Sensor connector on the AutoBoom harness cable.
5.
Connect the Right Outer Sensor connector to the installed right sensor cable.
6.
If optional inner boom sensors are installed, repeat the steps above to connect the inner sensors.
7.
Connect the Harness Cable to the Controller
Cable
Route the AutoBoom harness cable (P/N 115-0230-033) toward the machine's cab.
1.
Connect the harness cable to the controller cable (P/N 115-0230-007).
2.
Tighten the connector cab to secure the connection.
3.
Note:
Be sure to allow enough slack in the harness cable to allow for boom racking.

Connect the Field Computer

Refer to the Installation & Operation Manual and the appropriate wiring schematic beginning on page 24 for
installation and wiring instructions for your specific field computer.
Note:
If the harness cable is not long enough, it may be necessary to connect the 12' extension cable (P/
N 115-0171-386) between the harness and controller cables.

Connect the Power Leads

Locate the power cable that has the red and white power leads at one end.
1.
Disconnect the machine's connectors from the battery terminals.
2.
Install the red power lead on the positive battery terminal and reinstall the machine's battery connector.
3.
Install the white power lead on the negative battery terminal and reinstall the machine's battery connector.
4.
Manual No. 016-0230-106
Wiring Installation
23

Advertisement

Table of Contents
loading

Table of Contents