2. Commissioning
2.3.3 Switch-on behaviour of the CPV Direct
Power on
Hardware initialization
0
0
Communication initialization
4
0
0
Pre-Operational
1
2
Operational
Fig. 2/3: Status transfers of the CPV Direct (description see next page)
2-10
The following diagram shows the status transfers of the CPV
Direct.
2
3
Stopped
3
1
5
Festo P.BE-CP-CO2-EN en 0107NH