Tools Required for Installation
The following tools are required for installation and must be provided by the installer:
Figure 5.
Included Parts
Open the shipping container and verify that the following parts are present.
TLP Pro 525C
Figure 6.
TLP Pro 725C
Figure 7.
Safety Glasses
Vacuum Cleaner
Tools Required to Install the TLP Pro 525C or 725C Series Touchpanels
5-cable Pass-through
TLP Pro 525C or
TLP Pro 525C NC (1)
#6 Star Washer (4)
#6-32 Screw (4)
Parts Included with the TLP Pro 525C or TLP Pro 525C NC
TLP Pro 725C or
TLP Pro 725C NC (1)
Parts Included with the TLP Pro 725C or TLP Pro 725C NC
TLP Pro 525C and 725C Series Touchpanels • Mounting
Tape Measure
Marking Pen
2-space
Plate (1)
MAAP Frame (1)
1/4" Hole Plug (1)
3/8" Hole Plug (4)
Tie wrap (1)
Short Clevis Pin (1)
8-cable Pass-through
3-space
Plate (2)
AAP Frame (2)
1/4" Hole Plug (4)
3/8" Hole Plug (12)
#4-40 Screw (8)
#6 Star Washer (8)
Phillips Screw Driver
1/4" Hex Nut Driver
TLP Pro 525C
Connectivity
Bracket (1)
Cotter Pin (1)
HDMI Lockit (1)
3-space
Connectivity
Bracket (2)
#6-32 Screw (8)
12
Need help?
Do you have a question about the TouchLink TLP Pro 525C Series and is the answer not in the manual?