Taylor PH61 Operator's Manual page 39

Heat treatment peristaltic pump shake freezer
Hide thumbs Also See for PH61:
Table of Contents

Advertisement

7. Insert the valve cap into the hole in the mix inlet
adaptor. (See Figure 6-28.)
Figure 6-28
8. Insert the mix inlet assembly into the pump cylinder.
(See Figure 6-29.)
Figure 6-29
Note: The adaptor must be positioned into the notch
at the end of the pump cylinder.
9. Secure the pump parts in position by sliding the
retaining pin through the cross holes at one end of
the pump cylinder. (See Figure 6-30.)
Figure 6-30
Operating Procedures
Note: The head of the retaining pin should be at the
top of the pump when installed.
10. Assemble the feed tube assembly. Slide the check
ring into the groove of the feed tube.
(See Figure 6-31.)
11. Install one red O-ring on each end of the mix feed
tube and thoroughly lubricate. (See Figure 6-32.)
12. Lay the pump assembly, pump clip, feed tube, cotter
pin, and agitator in the bottom of the mix hopper for
sanitizing. (See Figure 6-33.)
15209
PH61 Peristaltic Pump
OPERATING PROCEDURES
Figure 6-31
Apply the appropriate
Taylor approved food safe lubricant.
Figure 6-32
Figure 6-33
15120
15121
6
12310
6-7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents