Section 9: Parts Replacement Schedule - Taylor PH61 Operator's Manual

Heat treatment peristaltic pump shake freezer
Hide thumbs Also See for PH61:
Table of Contents

Advertisement

Section 9
Part Description
Scraper Blade-Shake
Driveshaft Seal
Freezer Door O-ring-Shake
Front Bearing
Draw Valve O-ring
Spinner Shaft Seal-Shake
Pivot Pin O-ring
Restrictor Cap-Shake
Mix Feed Tube O-ring
Pump O-ring
Mix Inlet Tube O-ring
Mix Feed Tube Check Ring
Air Inlet Fitting Seal
Pump Driveshaft O-ring
Pump Valve Gasket
White Bristle Brush, 3" x 7"
Peristaltic Pump Tubes
White Bristle Brush, 1-1/2" x 2"
White Bristle Brush, 1" x 2"
Black Bristle Brush, 1" x 2"
Double-Ended Brush
Door-spout Brush
Brush Set (3)
Parts Replacement Schedule
Parts Replacement Schedule
Table 9-1
Every 3 Months
Every 6 Months
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Inspect and replace if
Inspect and replace if
Inspect and replace if
Inspect and replace if
Inspect and replace if
Inspect and replace if
Inspect and replace if
Inspect and replace if
PH61 Peristaltic Pump
Annually
X
Minimum
necessary.
Minimum
necessary.
Minimum
necessary.
Minimum
necessary.
Minimum
necessary.
Minimum
necessary.
Minimum
necessary.
Minimum
necessary.
9
9-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents