Cable Process 3/3
Step10
Connect the green
Connect the green
Connect the green
antenna cable.
antenna cable.
antenna cable.
Pass the additional Cable (black)
between the Boss and wall (dotted line).
Insert into the Boss.
(Push downward from the top of the Boss.)
Step11
Connect the additional
Connect the additional
Connect the additional
Cable (black).
Cable (black).
Cable (black).
WWAN Coaxial Cable
WWAN Coaxial Cable
WWAN Coaxial Cable
7-38
Cable Hold Sheet
Cable Hold Sheet
Cable Hold Sheet