Panasonic CF-19ADUAX M Series Service Manual page 40

Computer
Table of Contents

Advertisement

■ Line Processing of Antenna Cable
S1:
S2:
S4:
S5:
S1:Insulation S2:Pinching Cables
CAUTION
S3:Sharp Edge S4:Check Parts NO. S5:Others
Note: When processing the Cable, avoid any stress
on the soldered part of the PCB.
Ensure the Cable does not run over the rib,
boss and pin.
Screw(N1)
WWAN Main
Antenna
Screw(N1)
WLAN/
WIMAX AUX
Antenna
Screw(N1)
<Screw tightening torque>
0.2 ± 0.02N·m( 2.0 ± 0.2kgf·cm)
<Screw tightening order>
→ → → → →
How to wrap
LCD Cable Cushion
Apply pressure on the attached part.
5mm
5mm
5mm
1) Attach the Cushion
to the black Cable as
shown.
S3:
Details of "A"
Avoid running over
Avoid running over
Avoid running over
the rib, boss and
the rib, boss and
the rib, boss and
pin to avoid
pin to avoid
pin to avoid
catching the Cable
catching the Cable
catching the Cable
when LCD Rear is set.
when LCD Rear is set.
when LCD Rear is set.
A
Power Switch
Power Switch
Power Switch
Cable Sheet
Cable Sheet
Cable Sheet
LCD Cable Cushion
Hook each Cable
on the claws.
Avoid overlapping of
the Cable at right and
left of the claw as below.
3) Place the green
2) Fold back the Cushion
Cable on the attached
on the left side of the Cable
part.
and attach as wrapping
the Cable.
S2
Safety work
Wrap around the ANT
Wrap around the ANT
Wrap around the ANT
Cable and insert between
Cable and insert between
Cable and insert between
the ribs.When wrapping
the ribs.When wrapping
the ribs.When wrapping
one by one, wrap as
one by one, wrap as
one by one, wrap as
shown below.
shown below.
shown below.
How to wrap
Power Switch
Cable Sheet
The green Cable
comes on top.
15±3mm
15±3mm
15±3mm
S2
Safety work
Insert into the Front rib after wrapping.
The cushion must
come with in ±2mm
from the center of the rib.
Insert into the Front rib after wrapping.
LCD Cable Cushion
S2
Overlapping cable wiring.
(See figure right)
Becomes difficult to insert a Pen
4) Fold back the Cushion
on the right side of the
Cable and wrap 2 Cables.
7-18
S2
Details of "B"
Avoid running over the rib,
boss and pin to avoid
catching the Cable when
LCD Rear is set.
B
Power Switch
Power Switch
Power Switch
Cable Sheet
Cable Sheet
Cable Sheet
Insert between the ribs.
Hook each Cable
on the claws.
OK
Safety work
LCD Front
(MG)
Cable
Pen Holder
5) Wrapping complete.
Safety work
Screw(N1)
WWAN Main
Antenna
Screw(N1)
WLAN/
WIMAX AUX
Antenna
Screw(N1)
NG
LCD Front
Cable
Pen Holder

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cf-19aduax 1 m

Table of Contents