Panasonic CF-19ADUAX M Series Service Manual page 48

Computer
Table of Contents

Advertisement

7.2.7.
Setting the PAD PCB and SW PCB
1. Attach both the SW PCB and the Operation Sheet to the
Cabinet.
SW PCB
Operation Sheet
2. Connect the Power SW Cable to the Connector. (CN803)
3. Connect the FFC(PAD) to the Connector. (CN802)
4. Connect the SW PCB FPC to the Connector. (CN805)
5. Fix the PAD PCB using the 4 Screws. <N1>
<N1>:No.3
Connector
(CN803)
Power SW Cable
Connector(CN802)
SW PCB FPC
Note:
Tighten the Screws in the numbered order (No1 to No4).
Screws <N1> : DFHE5025XA
<N1>:No.2
<N1>:No.1
FFC(PAD)
<N1>:No.4
Connector(CN805)
PAD PCB
7.2.8.
Setting the left LED-Left PCB and
LED-Right PCB
1. Connect the FPC(LED Left) to the Connector. (CN806)
2. Fix the LED-Left PCB.
3. Connect the FPC(LED Right) to the Connector. (CN801)
4. Fix the LED-Right PCB.
5. After peeling released-paper of the LED PCB Tape and
the Palm Rest WP Sheet R, attach that.
6. Attach the Palm Rest Ass'y.
LED PCB Tape
FPC(LED Left)
LED-Left PCB
Connector(CN806)
LED-Right PCB
7.2.9.
Setting the Power PCB
1. Connect the Power SW Cable to the Connector. (CN780)
2. Fix the Power PCB using the Screw. <N1>
<N1>
Power PCB
Power SW Cable
Connector
(CN780)
Screws <N1> : DFHE5025XA
7-26
Palm Rest WP Sheet R
FPC(LED Right)
Connector(CN801)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cf-19aduax 1 m

Table of Contents