HP StorageWorks HA-Fabric Manager Installation Manual page 17

Hide thumbs Also See for StorageWorks HA-Fabric Manager:
Table of Contents

Advertisement

Ship group kit, containing:
• HAFM appliance.
• Ten (10) square alignment washers (required for rack-mounting in HP 9000,
10000 and 11000 series racks).
• HAFM application CD-ROM.
• HAFM boot/restore CD-ROM.
• Norton AntiVirus CD-ROM.
• Modem cable with RJ-11 connectors.
• CD-RW (blank).
• HAFM Release Notes.
• 10–ft. Ethernet cable.
• PDU power cord.
• 110–volt AC power cord.
• Null modem cable.
• Modem phone cable.
• Generic documentation for the HAFM appliance.
Rack-mount hardware kit, containing:
• Two (2) rear brackets (short) that attach to the cabinet (3.0 inches).
• Two (2) optional rear brackets (long) that attach to the cabinet (15.25
inches).
• One (1) left slide rail that attaches to the HAFM appliance (19.25 inches).
• One (1) right slide rail that attaches to the HAFM appliance (19.25 inches).
• Two (2) two-hole bar nuts for bolting the front and rear brackets together.
• Four (4) three-hole bar nuts for attaching the brackets to the rack-mounting
standards.
Figure
Figure 3
illustrates the front and rear brackets, slide rails, and bar nuts.
HP StorageWorks HA-Fabric Manager Appliance installation guide FW07.00.00/HAFM
SW 08.06.00
17

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the StorageWorks HA-Fabric Manager and is the answer not in the manual?

Questions and answers

Table of Contents