Installing The Switch On A Wall; Figure 9: Attaching The Brackets To Install The Switch On A Wall; Figure 10: Marking The Screw Hole Locations - Allied Telesis AT-GS950/8 Installation Manual

Gigabit ethernet smart switch
Hide thumbs Also See for AT-GS950/8:
Table of Contents

Advertisement

Installing the Switch on a Wall

AT-GS950/8, AT-GS950/16, AT-GS950/24 and AT-GS950/48 Switches Installation Guide
To install the switch on a wall, perform the following procedure:
1. Turn the switch over and place it on a table.
2. If the rubber feet are attached to the bottom of the switch, remove
them using a flat-head screwdriver.
3. Orient the brackets against the sides of the switch as shown in Figure
9, and secure them to the unit with the eight brackets screws included
with the switch.
Figure 9. Attaching the Brackets to Install the Switch on a Wall
4. Have another person hold the switch at the wall location where the
switch is to be installed, while you use a pencil or pen to mark the wall
with the locations of the four holes in the brackets. The switch should
be oriented such that its front faceplate is facing up and is level to the
floor. See Figure 10 on page 35.
Figure 10. Marking the Screw Hole Locations
35

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-gs950/24At-gs950/48At-gs950/16

Table of Contents