Chapter 5 System Installation Procedure; Required Tools And Personnel Protection Equipment (Ppe); Contents Of Lullaby Tm Warmer Packaging - GE Lullaby Warmer Maintenance And Service Manual

Table of Contents

Advertisement

Chapter 5
Lullaby
Warmer system should be installed by qualified personnel. Follow the instructions
TM
carefully to ensure proper mounting and safe operation of the Lullaby
5.1

Required tools and Personnel Protection Equipment (PPE)

CAUTION: -
Always use the personnel protection equipment when installing, dismantling,
servicing and conducting maintenance of the warmer.
5.2
Contents of Lullaby
Verify the following are included in the main packaging box. Also refer to order list placed by the
customer and to specific instructions before unpacking the box.
Sl.
Description
No.
1
Standard service Tool Kit
2
Leakage Current Tester
3
Anti- Static Wrist Strap
4
Anti- Static Mat
5
Safety glasses, Safety gloves and Safety shoes
36
2042376-001 Rev G
System Installation Procedure
Warmer Packaging
TM
©2012 General Electric Company. All rights reserved. Lullaby
Warmer.
TM
Warmer
TM

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents