Appendix E - Assembling And Dismantling The Msb Drawer Assembly; Figure 113: Mounting The Drawer Assembly With Base Leg Cover; Figure 114: Latch Operation In Slider - GE Lullaby Warmer Maintenance And Service Manual

Table of Contents

Advertisement

Appendix E – Assembling and Dismantling the MSB Drawer
Assembly
Section 1: MSB Drawer Assembly 2047911-001 (FRU kit No.) with Base Leg Cover.
Figure 113:
Figure 114:
Follow the instructions given below to mount the drawer assembly:
1.
Operate the latches (refer Figure 114) on both sides of the lower drawer to completely
detach the drawer from assembly.
2.
Place the drawer assembly on the leg assembly and align the holes with screw holes in
Base Leg Cover. Align the screws diagonally.
3.
Fasten the drawer assembly with Base Leg Cover (M5 fasteners, Qty 4).
4.
Tighten all the screws.
5.
Replace the lower drawer into the drawer assembly by operating drawer slide latches
as shown in Figure 114.
Follow the instructions given below for drawer dismantling:
1.
Remove the lower drawer from the drawer assembly.
2.
Unscrew all fasteners from drawer enclosure.
3.
Replace drawer assembly from base leg cover.
Note: Clamps in FRU kit can be disposed if the base leg cover is present on the Warmer
Section 2: MSB Drawer Assembly FRU kit No. 2055298-001 with Drawer Clamp.
Lullaby
Warmer
TM
Mounting the Drawer Assembly with Base Leg Cover
Latch Operation in Slider
2042376-001 Rev G ©2012 General Electric Company. All rights reserved. 135
Illustration
Description

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents