To install the S4100–ON Series (S4128F-ON, S4148F-ON, S4148FE-ON, S4128T-ON, S4148T-ON, and S4148U-ON), complete the
installation procedures in the order presented in this section.
Always handle the S4100–ON Series switch and its components with care. Avoid dropping the switch or any field replaceable units (FRUs).
NOTE:
ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap when
handling the S4100–ON Series switch and its components. As with all electrical devices of this type, take all the necessary
safety precautions to prevent injury when installing this switch.
NOTE:
For more information, see the
S4148F-ON, S4148T-ON, S4148FE-ON:
S4128T-ON, S4148T-ON:
www.dell.com/support/S4128T-ON/S4148T-ON
S4148U-ON:
www.dell.com/support/S4148U
Topics:

Unpack the switch

Rack or cabinet installation
ReadyRails installation

S4100-ON Series installation

Optics installation
Switch power-up
After switch installation
Switch replacement
Unpack the switch
NOTE:
Before unpacking the switch, inspect the container and immediately report any evidence of damage.
When unpacking the S4100–ON Series switch, make sure that the following items are included:
One S4100–ON Series (S4128F-ON, S4148F-ON, S4148FE-ON, S4128T-ON, S4148T-ON, or S4148U-ON) switch
One RJ-45 to DB-9 female cable
Two sets of rail kits, no tools required
Two PSUs
Four fan units
Two country- and region-specific AC power cords
Dell S4100–ON Series Setup Guide
Safety and Regulatory Information
Warranty and Support Information
24
S4100–ON Series installation
S4100–ON Series installation
Open Networking Hardware Diagnostic Guide found at the following sites: