Optics Installation - Dell EMC PowerSwitch S4100-ON Series Installation Manual

Table of Contents

Advertisement

Figure 22. Front rack installation
NOTE:
Do not the use the mounted Ready-Rails as a shelf or a workplace.
3
Tighten the two thumb screws and rack screws.
To remove the chassis from the rack or cabinet, press in the two side-release bars on the chassis at the same time and slide the chassis
forward.

Optics installation

The S4100-ON Series (S4128F-ON, S4148F-ON, S4148FE-ON, S4128T-ON, S4148T-ON, and S4148U-ON) switch has the following optic
configurations:
NOTE:
For the S4148U-ON, for the best optics performance, upgrade the Dell EMC software to 10.4(0.0) or higher.
Table 15. S4100-ON Series optic configurations
Platform
S4128F-ON
S4148F-ON
S4148FE-ON
32
S4100–ON Series installation
Description
28 fixed SFP+ optical ports
2 fixed QSFP28 optical ports
48 fixed SFP+ optical ports
2 fixed QSFP+ optical ports
4 fixed QSFP28 optical ports
24 LRM-capable fixed unified SFP+ optical ports
24 LRM-capable fixed SFP+ optical ports

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents