Configuring A Four-Post Thread; Installing A 1U Two-Post - Dell EMC PowerSwitch S4100-ON Series Installation Manual

Table of Contents

Advertisement

Configuring a Four-Post Thread

To install your switch in a four-post thread configuration, follow these steps.
1
For this configuration, remove the flange ear castings from each end of the ReadyRails assemblies. To remove the two
screws from each flange ear and remove each casting, use a Torx driver. See item 1 in the following illustration. Retain the
castings for future rack requirements.
2
For each rail, attach the front and rear flanges to the post flanges with two user-supplied screws at each end. See item 2 in
the following illustration.
Figure 28. Four-Post Threaded Configuration

Installing a 1U Two-Post

You can install the switch in 1U two-post (flush and center) configurations. Slide the system into the rails in the same manner as
the four-post configurations.
Install a S3100 Series System
38

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents