S4112-On Series Installation; Unpack; Unpack Steps - Dell EMC S4112F-ON Installation Manual

S4112–on series
Table of Contents

Advertisement

To install the S4112-ON Series (S4112F-ON and S4112T-ON) switch, complete the installation procedures in the order presented in this
section.
Always handle the switch and its components with care. Avoid dropping the switch or any field replaceable units (FRUs).
NOTE:
ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap when
handling the S4112–ON Series switch and its components. As with all electrical devices of this type, take all the necessary safety
precautions to prevent injury when installing this switch.
NOTE:
For more information, see the
Topics:

Unpack

Ground cable
Rack or cabinet installation
Half RU front-rack installation
Switch installation
Optics installation
Switch power-up
After switch installation
Switch replacement
Unpack
NOTE:
Before unpacking the switch, inspect the container and immediately report any evidence of damage.
When unpacking the S4112-ON Series switch, make sure that the following items are included:
One S4112F-ON or S4112T-ON switch
One RJ-45 to DB-9 female cable
AC power: two country- and region-specific AC power cables
Two AC power cable clips
DC power: two DC connectors
AC ground lug kit
DC ground lug kit—included in the accessories box
S4112–ON Series Set-up Guide
Safety and Regulatory Information
Warranty and Support Information

Unpack steps

1
Place the container on a clean, flat surface and cut all straps securing the container.
20
S4112–ON Series installation
S4112–ON Series installation
Open Networking Hardware Diagnostic Guide .
4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

S4112t-on

Table of Contents