To install the S5200F-ON Series (S5232F-ON, S5248F-ON, S5296F-ON, S5224F-ON, and
S5212F-ON) switch, complete the installation procedures in the order presented in this
section.
Always handle the switch and its components with care. Avoid dropping the switch or any
field replaceable units (FRUs).
NOTE:
ESD damage can occur if components are mishandled. Always wear an ESD-
preventive wrist or heel ground strap when handling the switch and its components.
As with all electrical devices of this type, take all the necessary safety precautions
to prevent injury when installing this switch.
Topics:
Unpack
Ground cable
Rack or cabinet installation
One-half U front-rack installation
One U ReadyRails installation
Two U four-post rack assembly
DC power connections
S5212F-ON only DC power connections
Optics installation
Switch power-up
After switch installation
S5200F-ON Series switch
Installation

S5200F-ON Series switch Installation