To install the Z9332F-ON switch, complete the installation procedures in the order presented in this chapter.
Always handle the switch and components with care. Avoid dropping the switch or its field replaceable units (FRUs).
NOTE:
ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap
when handling the Z9332F-ON switch and components. As with all electrical devices of this type, take all the necessary
safety precautions to prevent injury when installing this switch.
Topics:
•
Unpack
•
Ground cable
•
Rack or cabinet hardware installation
•
Rail installation
•
Optics installation
•
Switch start up
•
After switch placement
•
Switch replacement
Unpack
NOTE:
Before unpacking the switch, inspect the container and immediately report any evidence of damage.
When unpacking the switch, make sure that the following items are included:
•
One Z9332F-ON switch
•
Two sets of rail kits, no tools needed
•
One RJ45 to DB-9 female cable
•
Two hot-swappable PSUs
•
Seven hot-swappable fan units
•
Two country- and region-specific AC power cables
•
Dell EMC PowerSwitch Z9332F-ON Set-up Guide
•
Safety and Regulatory Information
•
Warranty and Support Information
Unpacking Steps
Unpack the system carefully.
1. Place the container on a clean, flat surface and cut all straps securing the container.
2. Open the container or remove the container top.
3. Carefully remove the switch from the container and place it on a secure and clean surface.
4. Remove all packing material.
5. Inspect the product and accessories for damage.
Ground cable
To attach a ground cable to the switch, use the included M4 screws.
NOTE:
For an AC-powered switch, although the third conductor of the AC power cable provides a ground path, Dell
EMC recommends grounding your switch with a dedicated ground wire.
Z9332F-ON switch installation
Z9332F-ON switch installation
4
15