Two-Post Center-Mount Installation - Dell EMC PowerSwitch S4100-ON Series Installation Manual

Table of Contents

Advertisement

2
Attach one rail to the front post flange with two user-supplied screws, item 2.
3
Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post flange with two user-supplied
screws, item 3.
4
Repeat this procedure for the second rail.

Two-post center-mount installation

NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
1
Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post flange with two user-supplied
screws, item 1.
38
S5200F-ON Series switch installation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents