S5200F-On Series Switch Installation; Unpack - Dell EMC PowerSwitch S4100-ON Series Installation Manual

Table of Contents

Advertisement

To install the S5200F-ON Series (S5232F-ON, S5248F-ON, S5296F-ON, S5224F-ON, and S5212F-ON) switch, complete the installation
procedures in the order presented in this chapter.
Always handle the switch and components with care. Avoid dropping the switch or its field replaceable units (FRUs).
For the S5212F-ON switch installation instructions, see
ON switches, you can install the ReadyRails system. Due to the chassis weight, the S5296F-ON switch does not support a two-post rack
installation; you must install the S5296F-ON in a four-post rack. For the S5296F-ON switch installation instructions, see
post rack
assembly.
NOTE:
ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap when
handling the S5200F-ON Series switch and components. As with all electrical devices of this type, take all the necessary safety
precautions to prevent injury when installing this switch.
Topics:

Unpack

Ground cable
Rack or cabinet hardware installation
One-half U front-rack installation
One U ReadyRails installation
Two U four-post rack assembly
DC power connections
S5212F-ON only DC power connections
Optics installation
Switch start up
After switch placement
Switch replacement
Unpack
NOTE:
Before unpacking the switch, inspect the container and immediately report any evidence of damage.
NOTE:
For the S5212F-ON and S5296F-ON switches only: the USB extension cable is packaged separately. Do not throw it
away.
When unpacking the switch, make sure that the following items are included:
One S5200F-ON Series switch
Two sets of rail kits, no tools needed
One RJ45 to DB-9 female cable
S5232F-ON, S5248F-ON, S5296F-ON, and S5224F-ON: Ground lug kit
S5232F-ON, S5248F-ON, S5296F-ON, and S5224F-ON: Two hot-swappable PSUs
S5232F-ON, S5248F-ON, S5296F-ON, and S5224F-ON: Four hot-swappable fan units
S5212F-ON: Two fixed PSUs
30

S5200F-ON Series switch installation

S5200F-ON Series switch installation
One-half U front-rack
installation. For the S5224F-ON, S5248F-ON, and S5232F-
4
S5296F-ON four-

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents