Service And Maintenance; General Information; 11.2 Maintenance Of Mechanism For Integrated Closing Sequence Control - GEZE Powerturn IS/TS Installation Instructions Manual

Table of Contents

Advertisement

Service and maintenance

11
Service and maintenance
11. 1

General information

The maintenance work on the closing sequence control must be carried out by an expert during the
maintenance cycle of the Powerturn drive.
à For maintenance instructions for the Powerturn swing door drive, see Powerturn installation instructions
"Service and maintenance" section.
à For maintenance instructions for the door closer, see the door closer user information.

11.2 Maintenance of mechanism for integrated closing sequence control

Clean hold-open magnet and test door hold-open capabilities.
X
Check rope for integrated closing sequence control to ensure it is under tension; increase tension if needed or
X
exchange wire rope if damaged.
Check rocker for integrated closing sequence control for secure attachment to the door closer; tighten screw if
X
needed or exchange the rocker for integrated closing sequence control if damaged.
Check castor (1) in the rocker for integrated closing sequence control to ensure it moves and turns easily.
X
If it is stiff, exchange the rocker for integrated closing sequence control and castor together.
For TS 5000 L:
Check the deflection pulley (2) for smooth function; lubricate and ensure smooth running function if needed.
X
22
1
Powerturn F/R-IS/TS
2

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Powerturn IS/TS and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Powerturn f-is/tsPowerturn f/r-is/ts

Table of Contents