Step 4 - Aligning Assemblies In Preparation For Drilling And Pinning 5 - Assa Abloy Yale 7370 Series Installation Instructions Manual

Multi-point lock for window shutter applications
Table of Contents

Advertisement

Step 4 – Alignment of components in preparation for drilling and pinning
An ASSA ABLOY Group brand
Thread the Top Clamp into the threaded hole
so that it extends the top latch to the proper
position for pinning. The Top Bolt Clamp will
assure that the top latch is in the correct
position for final installation.
• Prepare the lifting platform installation jig by
removing the two wing fasteners and their
washers.
• Introduce the lifting platform jig up through the
under side of the shutter as shown.
• Using the two wing fasteners and their
washers, secure the lifting platform jig to the
shutter.
The lifting platform jig will now be in position to
allow sliding the lifting platform (shown in step 2)
so that it rests against the shelf of the jig.
Continued on next page.............
5
80-8470-7370-010 (10-12)

Advertisement

Table of Contents
loading

Table of Contents