Step 4 – Alignment of components in preparation for drilling and pinning
1
6
An ASSA ABLOY Group brand
2
Before continuing to the next step be certain the
top pusher and bottom bolt are in the correct
position.
• Bottom Bolt should be flush to the bottom of
the shutter.
• The lifting platform (item 1) should be moved
down the bottom rod and placed against the
shelf of the lifting platform jig.
• Next secure the platforms position by
tightening the cone point set screw (item 2).
This will assure the point on the set screw
embeds itself firmly into the bottom rod.
80-8470-7370-010 (10-12)