Aligning Assemblies In Preparation For Drilling And Pinning - Assa Abloy Sargent FM6100 Series Installation Instructions Manual

Multi-point lock. window shutter applications
Table of Contents

Advertisement

FM6100 Series Multi-Point Lock
Alignment of components in preparation for drilling and pinning
4
3
• Thread the Top Bolt Clamp into the threaded hole so that
it extends the top latch to the proper position for pinning.
The Top Bolt Clamp will assure that the top latch is in the
correct position for final installation.
Top Bolt Clamp
• Prepare the lifting platform installation jig by removing the two
wing fasteners and their washers
Lifting platform jig
• Introduce the lifting platform jig up through the under side of
the shutter as shown.
• Using the two wing fasteners and their washers, secure the
lifting platform jig to the shutter.
The lifting platform jig will now be in position to allow sliding the
lifting platform (shown in step 2) so that it rests against the shelf
of the jig.
Continued on next page.............
A8058:A • www.sargentlock.com
5

Advertisement

Table of Contents
loading

Table of Contents