8. Prepare the manifold with all the tubing connected in Chap. 'Manifold and tubing connection' (p4).
Figure 20. Manifold with all the tubing connected
9. Insert the tubes and cells through the front cover first and hold the manifold in place.
Figure 21. Inserting the tubes and cells
10. Tighten the 4 bolts.
Figure 22. Tighten the 4 bolts
10
09931465A