Conducting An Inspection After Commissioning - MBO RW500 Operating Manual

Rewinder
Table of Contents

Advertisement

7.6

Conducting an inspection after commissioning

Prerequisites
Carrying out an in-
spection
Rewinder RW500
20 operating hours after the commissioning, it is necessary to perform
an inspection of all belts and tapes.
Proceed as follows to conduct the inspection after commissioning.
These prerequisites must be fulfilled:
• The machine is ready for operation.
Here's how to carry out an inspection:
Check all tapes and belts to make sure they run centered and have the
necessary tension.
If required, readjust these.
See Maintenance chapter.
The inspection has been carried out.
Installation, commissioning
Conducting an inspection after commissioning
95