OPeraTing range
COMIST 122 DSPGM
COMIST 122 DSPNM
COMIST 122 NM
mbar
30
25
20
15
10
5
0
500
1000
The working fields are obtained from test boilers corresponding to the standard EN676 and are indicative of the combination burner-
boiler. To ensure correct burner operation, the dimensions of the combustion chamber must comply with current regulations; if this is
not the case, consult the manufacturers.
Design feaTUres
•
Ventilating part in light aluminium alloy.
•
Centrifugal fan for high performances.
•
Comburent air intake with air flow control device.
•
Mounting flange to the sliding generator, to adapt the
protuberance of the head to various types of heating generators.
•
Adjustable blast-pipe with stainless steel nozzle and deflector
disk in steel.
•
A three-phase electric motor to run fan and another to run
the pump.
•
Air pressure switch to ensure the comburent air presence.
•
Electric servomotor with mechanical cam for simultaneous
regulation of fuel and combustion air.
•
Gas train complete with adjustment, operating, safety and pilot
valves, valve seal control, minimum and maximum pressure
switch, pressure regulator, and gas filter.
•
Gear pump with pressure controller.
•
Atomizer unit with magnet to control the nozzle delivery/
return pins.
•
Electrical fuel preheater including antigas valve, filter,
thermometer, regulation, minimum and safety thermostats.
•
Automatic command equipment and burner control according
to European regulation EN298.
COMIST 180 DSPGM
COMIST 180 DSPNM
COMIST 180 NM
1500
2000
2500
0006080118_201311
COMIST 250 DSPGM
COMIST 300 DSPGM
COMIST 250 DSPNM
COMIST 300 DSPNM
COMIST 250 NM
COMIST 300 NM
3000
3500
4000
•
Flame presence control with UV photocell.
•
Control panel including on/off switch, automatic/manual
operation selector and minimum/maximum selector, fuel switch,
indicator lights for operation, shutdown, turning on preheater
elements and amount of fuel used.
•
Terminal board for burner electric and thermostatic supply, and
to control the operation second stage or connect the power
electronic regulator.
•
Electrical system with IP40 protection rating.
VersiOns On reqUesT
•
Burner may be integrated with a steam-operated supplementary
fuel oil preheater which allows fuel oil to be heated with steam
from the boiler during regular operation, saving electricity.
•
Steam preheater.
7 / 44
kW
4500