Hardware installation
4.3.1

Installing the server in the PRIMECENTER Rack

The following parts are required to install the server in the PRIMECENTER
Rack:
– A support bracket with two M5x10 screws, including plug washers
– A rack mounting kit, consisting of two fully mounted telescopic rails
(left/right)
– Eight M5 centering fixtures (two each for front and back, left and right)
I
General information is provided in the Technical Manual for the
PRIMECENTER Rack (see
To mount the telescopic rail in the PRIMECENTER Rack, the support bracket
supplied must first be mounted on the left rear support upright.
Figure 3: Fitting the support bracket
Ê Mount the support bracket at the appropriate height on the left rear support
upright as described in the technical manual for the PRIMECENTER Rack.
I
For improved orientation, the height units are marked on the support
uprights.
RX600 S3 SAS
Installing the server in the rack/...